Ethekwini Point - 800mm Diameter Pipeline across Durban CBD
Design and construction monitoring of a DN800 Steel Water main along Anton Lembede Street and Mahatma Gandhi Road, supporting the new Point precinct development.
Project Overview
The project entailed design and construction monitoring of a DN800 Steel Water main along Anton Lembede Street from Alexander Street (CH 0 000) to Mahatma Gandhi Road (CH 2250) and along Mahatma Gandhi Road from Anton Lembede Street (CH 2 250) to Camperdown Road (CH 4 150). The purpose of the project is one of the critical services that are currently being upgraded to meet the near-future development demands which shall see the new Point precinct developing in a multi-billion dollar economy of eThekwini Metro Municipality, in line with the city's integrated development plan.
The Challenge
The project required careful coordination of major infrastructure work in a busy CBD area, ensuring minimal disruption to existing services and traffic while implementing critical water supply upgrades.
Our Solution
Our team implemented a systematic approach to design, construction monitoring, and quality control, ensuring all works meet municipal standards while supporting future development needs.
Results
Successfully delivered critical water infrastructure upgrades that support the Point precinct's development while maintaining service continuity.
Key Features
- 4150m of DN800 steel water main installation
- Associated valves and chamber structures
- Road surface remedial works
- Connection to existing AC reticulation
- Paving area refurbishment (20,000m²)
- Contract Administration and Inspection
Project Gallery
Project Details
Specifications
Our Featured Projects
Explore our latest engineering achievements and successful project deliveries

Load Line Length Verification & Modifications – Open Ocean 870
Expert naval architectural services for Two Oceans Marine Manufacturing, assisting with critical modifications and compliance verification for the Open Ocean 870 luxury catamaran.

CTV Deck Tie-Down Design for Legacy Marine
Specialized naval architecture services for structural analysis and safe working load (SWL) verification of a deck tie-down pipe on a Crew Transfer Vessel (CTV).

TNPA 763 - Dry Dock Fire System Upgrade at the Port of Durban
A comprehensive fire system upgrade project at the Port of Durban, including fire suppression, detection, and alarm systems.