CTV Deck Tie-Down Design for Legacy Marine
Naval Architecture

CTV Deck Tie-Down Design for Legacy Marine

Specialized naval architecture services for structural analysis and safe working load (SWL) verification of a deck tie-down pipe on a Crew Transfer Vessel (CTV).

Legacy Marine
Completed 2024

Project Overview

Provided specialized naval architecture services for structural analysis and safe working load (SWL) verification of a deck tie-down pipe on a Crew Transfer Vessel (CTV).

The Challenge

The project required precise structural analysis to ensure the deck tie-down system could safely secure cargo and equipment during vessel operations.

Our Solution

We conducted comprehensive structural analysis and SWL verification to ensure the deck tie-down system met safety standards and operational requirements.

Results

Successfully delivered a robust deck tie-down design that ensures safe cargo securing during vessel operations.

Key Features

  • Structural analysis
  • SWL verification
  • Safety compliance
  • Operational optimization

Project Gallery

Project Details

Client
Legacy Marine
Category
Naval Architecture
Completion Date
2024

Specifications

Vessel Type
Crew Transfer Vessel (CTV)
Client
Legacy Marine
Completion Date
2024