CTV Deck Tie-Down Design for Legacy Marine
Specialized naval architecture services for structural analysis and safe working load (SWL) verification of a deck tie-down pipe on a Crew Transfer Vessel (CTV).
Project Overview
Provided specialized naval architecture services for structural analysis and safe working load (SWL) verification of a deck tie-down pipe on a Crew Transfer Vessel (CTV).
The Challenge
The project required precise structural analysis to ensure the deck tie-down system could safely secure cargo and equipment during vessel operations.
Our Solution
We conducted comprehensive structural analysis and SWL verification to ensure the deck tie-down system met safety standards and operational requirements.
Results
Successfully delivered a robust deck tie-down design that ensures safe cargo securing during vessel operations.
Key Features
- Structural analysis
- SWL verification
- Safety compliance
- Operational optimization
Project Gallery
Project Details
Specifications
Our Naval Architecture Success Stories
Discover how we've helped transform naval architecture infrastructure across various projects

Load Line Length Verification & Modifications – Open Ocean 870
Expert naval architectural services for Two Oceans Marine Manufacturing, assisting with critical modifications and compliance verification for the Open Ocean 870 luxury catamaran.

TNPA 763 - Dry Dock Fire System Upgrade at the Port of Durban
A comprehensive fire system upgrade project at the Port of Durban, including fire suppression, detection, and alarm systems.

Transnet Richards Bay - Port Survey & As-Built Drawings
Provision of a detailed Port Survey to provide as built drawings for all services within the Port Boundary at the Port of Richards Bay in an editable format.